You can add a calendar-based trigger to a scheduled report e.g. that launches the scheduled report always on Mondays and Wednesdays at 4 pm.
Accept the changes by clicking Save. You can delete an existing trigger by clicking Delete.
Calendar-based trigger type of repetition